There are some common concepts used when discussing the productivity of software developers. These concepts aren’t specific to designing metrics, but they frequently come up when we think about which metrics to choose.
One of the most important things to optimize about software engineering is “iteration time,” which is the time it takes for an engineer to make an observation, decide what to do about that observation, and act on it. There are small iterations, like when a person is coding, they might write a line of code, see the IDE give it a squiggly red underline, and fix their typo. And there are huge iterations, like the time between having an idea for a whole product and then finally releasing that product to its users, getting feedback, and making improvements to the product. There are many types and sizes of iterations, like doing a build and seeing if your code compiles, posting a change and waiting for a code review comment, deploying an experiment and analyzing feedback from users, etc.
Sometimes, we don’t have a set expectation for how many iterations a process should take, but we know that if we speed up the iterations, the process as a whole will get faster. It’s a safe general assumption to make in almost all cases.
Also, there are times when you fundamentally change the nature of the work by reducing iteration time. For example, if it takes 2 seconds to run all my tests, I can run them every time I save a file. But if it takes 10 minutes, I might not even run them before submitting my code for review. In particular, work can dramatically change when iterations become short enough to eliminate context switching, as described below.
Developers will “context switch” to another activity if they have to wait a certain amount of time for something. For example, they might go read their email or work on something else if they have to wait longer than 30 - 60 seconds for a build to complete. The specific time depends on various factors, such as a person’s expectations for how long the task should take, how the task informs the developer of its progress, etc.
When you interrupt a developer for long enough, they could take up to 10 - 15 minutes to mentally “reload” the “context” that they had for the change they were working on. Basically, it can take some time to figure out what you were working on, what you were thinking about it, and what you intended to do.
So if you combine those two, there’s a chance that every time you make somebody wait longer than a certain amount (let’s say 30 seconds, on average), you actually could lose fifteen minutes of their time. Now, this isn’t an absolute thing–you might only lose two or three minutes for a 30-second wait, but you might lose 5 - 10 minutes for a 3-minute wait.
Also, sometimes important context is entirely lost from the developer’s mind when you make them context switch, especially when the context switch comes from a sudden interruption (like having some service go down that they depend on for development). They come back to what they are doing and have forgotten something important, leading to bugs or missed opportunities in your actual production systems.
So it’s important to avoid making developers context switch.